Although chandeliers installation isn’t difficult it has to be done by a competent person. There are two main ceiling structures: concrete and wooden. Chandeliers have to be hung from a structure capable of carrying the chandeliers weight, never from the plaster board.
Concrete is my least favourite ceiling structure due to a) the complexity of anchoring the chandelier hook into the concrete and b) overcoming the awkward void which can vary from 1 inch to 3 feet. Unless you are a very practical person or were overseeing the construction/reconstruction of the actual room you will not be aware of the voids existence not to mention the size. For the small voids you can use the plate hook, for the larger voids there are various types of brackets available.
First of all you need to find out the exact construction so a thorough site inspection is critical. You need to know whether there is under floor heating and if so how deep it is to make sure there is absolutely no chance you could drill through the heating pipe. If you cannot be 100% certain then do not proceed with the installation because damaging the under floor heating pipe would release gallons of water which cannot be stopped and the thing you can do is to put bucket under the flow, stop the feed to the tank and empty the buckets for an hour or two. Next is to call your insurance company to agree the commencement of repair works which basically means digging up some of the concrete, repair of the pipe and restoring everything to the original state. This would cost you hundreds of hours on the phone and thousands of pounds in damages and delays so your insurance premium would go up ten fold. Other hidden dangers are various cables and in older properties gas pipes which can be literally anywhere and I actually hang one of my chandeliers of a disused gas pipes which was just in the perfect spot.
Another difficult aspect is the actual anchoring so please make sure you are using proper concrete fixing
and taking into consideration the distance between the holes on the plate hook
because if these are too close together you may have to make a separate base plate of 4x2 or similar to avoid jeopardising the integrity of that particular concrete spot by the close proximity of drilling.
And yet another difficult aspect is accessing the concrete ceiling. There are many types of suspended ceilings and the larger the void the larger the access point for the installation is required. A competent project manager will have all the necessary chandelier fixings done prior to the suspended ceiling installation going up however such creatures are few and far between and I would say almost mythical. A great way and sometimes the only way is to hide the access holes by a ceiling rose. Just make sure the ceiling rose is suitable for the room.
Wooden ceilings are easy in comparison
however as you have to attach the chandelier hook to a joist if there is none in the right position you may need to access the joist to fit a noggin. Access can be either from above or below depending which option is less destructive. On a recent installation we had to move a double bed, a cot and newly laid carpet to put in a noggin, which was easier than taking off the new ceiling rose, cutting a hole in the ceiling to get to the joists from beneath, putting new plaster board piece in, re-plastering and putting the ceiling rose back up. Both options are time consuming and any unnecessary work could be avoided by careful project management or just a bit of common sense –do the messy hook installation before you put the tiles, hard floor or new carpets down, before the plaster board goes up and most certainly before the ceiling rose.
Whatever the structure, please take few minutes to think and plan ahead and if you struggle to come up with a solution just call us to see if we can come up with something.
Take care.